Current and Past Projects

2024-10-15T14:41:04-05:00

Fountain View and Richmond Avenue Intersection Improvements

T-0121 The project consists of safety improvements at the intersection of Fountain View and Richmond Avenue, in order to reduce vehicular collisions and improve traffic conditions and increase safety for pedestrians and cyclists in the area. Status: Currently in the preliminary study phase.

2024-02-11T16:17:15-06:00

Buffalo Bayou Mid-Reach Flood Mitigation Study

Buffalo Bayou Mid-Reach Flood Mitigation Study $140,000,000 Total Budget Appropriation (To Date) Gauge completed a proof-of-concept study for a gravity flow inverted siphon stormwater tunnel and surface stormwater conveyance improvements for St. George Place Redevelopment Authority – TIRZ 1. The study determined that a gravity flow tunnel fed [...]

2024-11-12T14:56:09-06:00

Pedestrian Safety Improvements & Safe School Sidewalks

The project includes “Safe Routes To School” sidewalk for Pilgrim Academy along the HCFCD channel, pedestrian safety improvements at the intersection of Fountain View and Fairdale Lane, area wide intersection safety improvements, and Safe School Crossings at Hillcroft near Wisdom Highschool.